Arohan Solution and Services LLP

Engineering for energy and site infrastructure

Designed, supplied, installed and commissioned by one accountable contractor.

Solar, storage, earthing, fire and safety systems, mechanical car parking and whatever else your site needs, checked the way an owner's engineer would check it. Where you want an engineer on your side or power without capex instead, we do that too: one role on each project, declared in writing.

Three roles, one per project A project in the centre. Above it, the main role: EPC contractor, design, supply and install. Below it, the two further roles: engineer on your side, and power without capex. Arohan takes one of them on any project. Your project EPC contractor design · supply · install Engineer on your side Power without capex
One role per project, declared in writing.

The work

The problems we are brought

If you recognise your situation in one of these, it is usually work we can help with.

  • We need one contractor to deliver it, not five vendors.

    Plant heads, facility managers, project owners

    When equipment, installation, electrical works and commissioning are bought separately, every interface between them becomes the owner's problem, and each vendor can point at the next when something does not work.

    EPC

  • Our earthing and safety systems need fixing before an audit.

    Plant heads, safety and compliance teams, data-centre operators

    Earth pits, lightning protection and fire systems are usually tested once a year and forgotten in between. The problems an audit finds are often visible months earlier, if anyone is measuring.

    EPC Client's engineer

  • Our site is short of parking, and there is no land to spare.

    Commercial buildings, campuses, offices and residential societies

    A mechanical stack or puzzle system can put two to four cars in the floor space of one, but whether it fits depends on clear height, slab or pit, power supply and how the cars move in and out, not on the brochure.

    EPC

  • We want battery storage on site, and nobody can tell us how it is kept safe.

    Data centres, manufacturers, public buildings

    Lithium-ion storage carries real fire and thermal-runaway risk. When safety is left to the supplier's standard container and an audit at the end, the questions arrive after the equipment is on site.

    EPC Client's engineer

  • Our power cost is rising faster than our output.

    Manufacturers, data centres, industrial estates

    The right answer depends on your tariff, your load profile and your state's rules. Sometimes it is a plant you own, which we can build; sometimes it is power bought by the unit; sometimes it is neither, and we say so.

    EPC Power without capex

  • A vendor has offered us a plant and the payback looks too good.

    Plant heads, CFOs, boards, lenders and investors

    The proposal was prepared by the party who benefits if it proceeds. The assumptions that break a case are almost always engineering assumptions wearing financial clothing: yield, load match, degradation, export tariff.

    Client's engineer

  • Our project is already underway and it is not going to plan.

    Owners in construction or commissioning

    Reported progress and actual progress diverge quietly. By the time the gap is visible in the schedule, the contract may no longer protect you the way it did at signing.

    Client's engineer

Delivery

How an EPC project runs

Seven stages from site survey to maintenance. You sign the specification before anything is bought, and the system is accepted on tests your team witnesses.

  1. 01

    Site survey

    A survey record and the site constraints that decide what can be built and what it costs.

  2. 02

    Design & specification

    A specification and price you sign before anything is bought.

  3. 03

    Procurement

    Equipment with its makers' certificates, test records and warranties.

  4. 04

    Installation

    An installed system with inspection records and every non-conformance closed.

  5. 05

    Testing & commissioning

    A commissioning record you sign, on test results rather than on a date.

  6. 06

    Handover

    A handover pack your team can run the system from.

  7. 07

    Maintenance & monitoring

    The system kept to its specification, with readings you can see between visits where monitoring is fitted.

Arohan Partner Network · closed pilot

Know a business with a large power bill?

Consultants, installers and advisers introduce a business, its bill and its consent. Arohan structures the energy deal, and the partner is paid per unit delivered, after the customer pays.

Prakreon, a brand of Arohan

A process and software company

Prakreon runs the repetitive information work of businesses — quotations, certificate packs, tenders and follow-ups — as tested processes on the tools they already use. The owner approves before anything goes out. It also builds the software and monitoring Arohan uses.

  • Prakreon Quote

    Reads the enquiry and drawing, costs it from your own rates, and prepares the quotation.

  • Prakreon Dossier

    Prepares each order's QA/QC document pack, reusing earlier packs where they fit.

  • Prakreon Pipeline

    Researches leads, writes specific emails, follows up and keeps the pipeline.

  • Prakreon Bid

    Reads new tenders, checks eligibility, gives a bid or no-bid view and prepares the documents.

Products: BISBridge (in use at one centre) and The ESG (in demonstration). prakreon.com →

Who is accountable

Full profiles →
  • Viral Patel

    Co-Founder and Managing Partner

    2014 – present, in energy infrastructure

    A petroleum engineer who built, commissioned and ran city-gas and CNG infrastructure before moving into solar. He leads Arohan's EPC delivery, its client's-engineer work and the structuring of power arrangements.

    • Gujarat Gas (Morbi): built, commissioned and operated 247 km of steel and 900 km of PE network, serving 24,000+ customers at 7.7 MMSCMD.
    • Adani Total Gas: delivered 16 CNG DODO stations, 4 COLO stations, 1 LCNG station and 1 DCU, plus an LNG regasification project. Star Performer Award, 2023.

    LinkedIn →

Legal name
Arohan Solution and Services LLP
LLPIN
ACZ-9638
GSTIN
24ACPFA1718A1ZW

Start here

Tell us the site and what it needs.

Drawings, photos, a bill or a tender, whichever you have. We will tell you what we would survey first, and if it is not work we should be doing, we will say so.

Discuss a project consult@arohan.group

A partner replies within one working day.