Our approach
How we work
What you can hold us to before you brief us: the one role we take on a project, how we check our numbers, when we tell you not to proceed, and what we refuse.
One role per project
On any one project we hold one role: your engineer, your contractor (EPC), or the party offering you power under a RESCO, PPA or group-captive arrangement.
The role is written at the top of every proposal, before any work starts. As your engineer we do not bid for the construction, we do not sell equipment, and we do not offer you power on the same project. When we are your contractor or are offering you power, we are not your engineer, and if you want our work or our offer reviewed independently you should appoint another firm to do it.
When we build it, we check it as an engineer would
Most of our work is building: designing, supplying, installing and commissioning energy systems and site infrastructure. We hold that work to the checks we would apply as someone else's engineer. We survey before we price. You sign a specification before anything is bought. The system is accepted only on tests your team witnesses, and it is handed over with the drawings, records and training your team needs to run it. Fire and electrical safety are designed in from the first drawing.
We start with the constraint, not the brief
The problem as written in the enquiry is rarely the problem. A parking shortfall turns out to be a clear-height and pit question. A power cost turns out to be a tariff and load-profile question. A storage project turns out to be a fire-safety and approvals question. A delayed plant turns out to be a contract that stopped protecting the owner months ago.
So the first part of most engagements is spent finding what actually limits the outcome, from the bills, the load data and the documents you already hold.
We check our numbers before we recommend
Every recommendation carries the analysis behind it, and we will walk you through the assumptions until you can break them yourself. Every material assumption is labelled as measured, benchmarked or estimated; yield is stated at P90 as well as P50; and the estimates that would break the case are sensitivity-tested and named rather than buried.
We tell you when not to proceed
Sometimes the numbers say no. A feasibility study that always concludes "proceed" is a sales document. When the case only works at P50, when the load does not support the plant, when grid access will not arrive in time, or when an efficiency measure would deliver most of the benefit without the capital, we say so.
The conditions under which we would recommend stopping are written down at the start, while nobody is committed and no one's position depends on the answer. Deciding whether to stop from inside the disappointment is a decision made by the wrong person at the wrong time.
What we will not do
A firm that has never turned down work has no standards, only a pipeline. Ours are short and we apply them:
- Work whose principal effect is mass harm, or mass surveillance of populations.
- Engagements that require us to mislead the public, a regulator, or an auditor about what the work is.
- Assignments where the honest answer is already known and we are being hired to write it down differently.
- Projects that trade irreversible environmental damage for a commercial result.
Where a project sits close to one of these lines, the review is written rather than informal, and the burden of proof rests on proceeding rather than on stopping.
When we are your engineer: the seven stages
-
Feasibility & business case
Load study from interval data, energy audit, solar yield, battery sizing, and a tariff and payback model built on your actual bills rather than on connected load.
What you have at the end A business case you can interrogate line by line, with the assumptions that break it named — including, when warranted, a recommendation not to proceed.
-
Owner's requirements & basic engineering
Technical specifications for solar, battery chemistry, power conversion, protection and grid interconnection, written before anyone bids. Fire safety for lithium-ion storage is written into the specification here, not added at the end.
What you have at the end An owner's requirements document that bidders price against, with the scope interfaces between civil, electrical and grid explicitly assigned.
-
Regulatory support
Open-access, net-metering and connectivity applications, and the CEA and fire-safety compliance a plant needs before it is energised.
What you have at the end The regulatory route confirmed for your state and site, with the applications filed and their status tracked.
-
Tendering & procurement
EPC and equipment-maker bid documents, technical and commercial bid evaluation, and support through contract negotiation. A materially low bid is treated as a risk to investigate, not a saving.
What you have at the end A bid evaluation on lifetime cost and delivery record, and a contract whose guarantees and damages are tested against the real exposure.
-
Design review, vendor audits & FAT
Review of the EPC contractor's drawings and calculations, factory inspections, and factory acceptance tests for modules, inverters and battery containers.
What you have at the end Design comments closed before construction, and equipment accepted against the specification before it ships.
-
Construction supervision & commissioning
Quality, schedule and HSE oversight on your behalf, witness of testing and commissioning, and verification of the performance guarantee over a representative period rather than on a single good day.
What you have at the end Non-conformances tracked to closure, a witnessed commissioning record, and a performance-guarantee test you can rely on.
-
Post-commissioning advisory
Review of the energy-management control strategy, performance monitoring against what was guaranteed, and warranty and guarantee claim windows kept in view.
What you have at the end A baseline of how the plant actually performs, and a clear owner for defending that performance.
How the work is governed
The same model applies to every engagement, whatever the discipline. These are commitments rather than intentions — a client should be able to hold us to each one by week three.
-
One role, declared in writing
On any one project we hold one role, written at the top of the proposal: your engineer, your contractor (EPC), or the party offering you power. As your engineer we are never also your contractor or your power supplier on that project.
-
A named partner is accountable
Every engagement has one partner answerable for it end to end, in the room at scoping and still in the room at commissioning.
-
Fixed reporting cadence
Written progress reporting at an agreed interval, covering what moved, what did not, what is at risk, and what we need from you. Reporting continues in the weeks when there is little to report.
-
A live risk register and decision log
Risks are logged with owner, likelihood, impact and mitigation. Significant decisions are recorded with the reasoning and the alternatives rejected, so anyone can later reconstruct why a choice was made.
-
Written stop conditions
The observable conditions under which we would recommend stopping are agreed at the start, while nobody is committed. If they are met, we say so.
How risk is controlled
- Assumptions are tested before they are relied on. Every material assumption in a model is labelled as measured, benchmarked or estimated. Estimates are sensitivity-tested, and the ones that break the case are flagged rather than buried.
- Independent technical review. Engineering and safety-critical work is checked by a second qualified person. Where a discipline sits outside our depth, we say so and bring in a specialist rather than stretching.
- Staged commitment. Work is structured so you can stop at a stage boundary without wasting what came before.
- No conflict on any one project. When we are your engineer we do not build, supply equipment or offer you power on that project. When we build it as your EPC contractor, we are not also its independent checker.
How we handle your information
- NDAs signed before commercial or technical detail is exchanged, including at first meeting where you prefer.
- Bills, load data and drawings held only for the engagement and its agreed retention period, then returned or destroyed on request.
- Named-team access only. People outside the engagement do not have access to your material.
- We do not use client work as marketing without written approval.
Questions buyers ask before an engagement
Do you build the systems yourselves?
Yes, as your EPC contractor: we design, supply, install and commission the system under one contract, with qualified equipment makers and licensed installers. On a project where you have hired us as your engineer instead, we do not build or supply on that project; we check the contractor you appoint.
Can you work alongside our existing consultants or contractor?
Yes. As EPC contractor we work with the consultants and engineers you already have. As your engineer we work alongside a contractor you have appointed, including an independent review of work already done. If the existing approach is sound, we say so.
Can you work with government organisations and PSUs?
Yes. We can supply entity documentation, registration details and the technical credentials that procurement processes require. Ask and we will send them.
How do you protect confidential information?
NDAs before detail is exchanged, named-team access only, agreed retention and destruction, and no use of client work in marketing without written approval.
What does an engagement cost?
It depends on scope, and we will not quote a range before understanding the problem. We will tell you early if the work is likely to be outside your budget, rather than discovering it at proposal stage.