Power without capex

Power without capex

You pay for the energy delivered, per unit, at a tariff agreed for the term. You do not buy the plant. The plant is financed through Arohan, with the funding arranged for each project, and built by an EPC contractor named in the proposal, and on that project Arohan is the party offering you power, not your engineer.

In short

The problem

Renewable power would lower the energy bill, but the capital is needed elsewhere, the balance sheet should not carry a power plant, and nobody on the team wants to manage an EPC contract.

Why it matters

Buying power under a long-term agreement moves the capital and the construction risk to someone else. It also locks in terms for many years, so the structure, the tariff and the exit clauses have to be right at signing.

Who typically needs this

  • Manufacturers with steady daytime load and a rising grid tariff
  • Businesses that prefer an operating cost to a capital project
  • Groups with several sites that could share one off-site plant
  • Public bodies procuring power rather than assets

Scope

  • RESCO on your roof or land
  • Power purchase agreement (PPA)
  • Group captive
  • Open access from an off-site plant
  • Solar with battery storage where the load needs it

Most businesses that want renewable power do not want a power plant. They want a lower, more predictable cost per unit, without putting capital into an asset outside their core business and without managing its construction.

That is what a power-purchase structure is for. Someone else finances, builds and runs the plant. You buy what it produces, per unit, at a tariff agreed for the term.

Four structures

RESCO puts the plant on your roof or land. A power purchase agreement is the contract that sets the tariff and terms, on-site or off-site. Group captive lets several consumers share an off-site plant by holding a minority stake in it. Open access brings power from an off-site plant over the grid. Which one fits depends on your load, your site and your state’s rules.

Who does what

  • You sign the agreement and pay per unit delivered.
  • Arohan structures the deal and arranges the financing of the plant.
  • The EPC contractor named in the proposal builds it: an independent contractor, or Arohan as contractor.
  • The agreement sets out operation, maintenance and what happens at the end of the term.

On a project where Arohan is offering you power, Arohan is not your engineer. If you want our offer reviewed independently, appoint another firm to do it.

What you actually receive

Services describe activity. These are the artefacts that exist at the end, and that you own.

  1. RESCO

    The plant is installed on your roof or land and owned by the project, not by you. You pay a per-unit tariff for the energy it delivers, for the agreed term. No capex on your side.

  2. Power purchase agreement

    A long-term contract for energy at an agreed tariff. It sets the term, the tariff and how it may change, metering and billing, what happens if the plant under-delivers or you consume less, and how the agreement ends.

  3. Group captive

    You take a minority equity stake in the generating company alongside other consumers and buy its power. The structure only works while the captive-user equity and consumption criteria are met every year, so compliance is part of the design.

  4. Open access

    Power from an off-site plant delivered over the grid. Open-access charges, surcharges and banking rules vary by state and change over time, and they decide whether the tariff is worth having.

How we approach the work

  • The bill comes first

    We start from your electricity bill and, where available, the interval load data. The structure — on-site or off-site, solar alone or with storage, RESCO, PPA or group captive — follows from those numbers and your state's rules, not from what we would prefer to build.

  • Who funds, who builds, who runs

    Arohan arranges the financing of the plant for each project. It is built by an EPC contractor named in the proposal (an independent contractor, or Arohan as contractor where one party for supply and construction suits you), and operated and maintained under the agreement for its term. You pay for units delivered.

  • What you sign

    The agreement states the tariff and how it may change, the term, metering and billing, minimum and maximum offtake, what happens if the plant under-delivers, insurance, and termination. We go through each clause before signing, because these terms run for many years.

  • What happens at the end of the term

    The agreement says, at signing, what happens to the plant when the term ends — transfer to you, extension, or removal. That question is settled at the start, not at year twenty-five.

How we hold ourselves to it

  • One role per project, declared in writing. When we offer you power, we are not also your engineer on that project.
  • The EPC contractor who builds the plant is named in the proposal, so you know who answers for construction.
  • No technology is promised before the analysis. The structure follows your bill, your load and your state's rules.

Questions buyers ask about this work

Do we need to put in any capital?

Under a RESCO or PPA arrangement, no. You pay per unit for the energy delivered. Under group captive you take a minority equity stake in the generating company, which is a smaller commitment than owning a plant but is not zero.

Who builds and maintains the plant?

The EPC contractor named in the proposal builds it: an independent contractor, or Arohan where one party for supply and construction suits you. Operation and maintenance are covered under the agreement for its term.

What tariff will we pay?

It depends on your load, your site or the off-site route, your state's open-access charges and the term. We will not quote a number before seeing your bill.

Can Arohan also be our engineer on the same project?

No. On any one project we hold one role. If you want our offer reviewed independently, use another firm. We can act as your engineer to review someone else's power offer, on a project where we are not offering power ourselves.

Power without capex

Send us the electricity bill

One recent bill, and the interval load data if you have it, is enough for a first view of whether a RESCO, PPA, group-captive or open-access arrangement makes sense for your site.

Ask about buying power consult@arohan.group

A partner replies within one working day.